The Joint Pilot Activities
Construction Work of the Vacuum Sewage Collection System
- Purpose: To progress the development of sewerage system by using Vacuum collection system as the first attempt in Iran in order to reduce water pollution load from urban area.
- Outcome: Pipes (12.8 km), 170 chambers (manholes) and vacuum valve unit, operation & maintenance of vacuum sewerage system and a power generator for emergency were installed until now in Koliver area of Anzali city.
- Future Plan: Connection work between each house and the vacuum sewerage system will be conducted